Reserves & resources


Jim Davidson, Technical Director
Jim Davidson, Technical Director

Careful management of Petra's major diamond resource will ensure sustainable, long-life mining for many years. It also provides flexibility in terms of organic growth and the Company has plans in place to substantially increase output, most notably at the Cullinan and Williamson mines.

Gross reserves and resources

As at 30 June 2010, the Group's total carat base had reduced by roughly one million carats to 261 million carats (FY2009: 262 million carats), mainly due to depletion by production at the mining operations over the year.

Attributable reserves and resources

The Group's attributable reserves and resources increased significantly in the Period by approximately 75 million carats to 194 million carats (FY2009: 119 million carats). This major increase is due to the doubling of Petra's interest in the Cullinan mine, which accounts for some 77% of the overall Group reserves and resources.

General notes on reporting criteria

  1. Resources are reported exclusive of reserves.
  2. Tonnes are reported as millions. Contained diamonds are reported as millions of carats (“Mcts”).
  3. Tonnes are metric tonnes, and are rounded to the nearest 1,000 tonnes. Carats are rounded to the nearest 1,000 carats. Rounding off of numbers may result in minor computational discrepancies.
  4. Resource tonnages and grades are reported exclusive of internal waste, unless where otherwise stated.
  5. Reserve tonnages and grades are reported inclusive of external waste, mining and geological losses and plant modifying factors. Reserve carats will be less than resource carats on conversion and this has been taken into account in the applicable statements.

The following table summarises the reserve and resource status of the combined Petra Group operations as at 30 June 2010:
  Gross Net attributable
Category Tonnes
(millions)
Grade
(Cpht)
Combined diamonds
(Mcts)
Tonnes
(millions)
Grade
(Cpht)
Combined diamonds
(Mcts)
Ore/Diamond reserves
per asset
           
Proven 17.898 7.13 1.276 12.837 8.38 1.076
Probable 37.441 22.85 8.555 27.418 23.99 6.576
Sub-total 55.339 17.76 9.831 40.255 19.01 7.652
Diamond resources
per asset
           
Measured            
Indicated 354.709 52.83 187.400 263.217 52.70 138.711
Inferred 1226.551 5.21 63.895 912.924 5.27 48.148
Sub-total 1581.260 15.89 251.295 1176.140 15.89 186.859
Total     261.126     194.511
“cpht” – carats per hundred tonnes; “Mcts” – millions of carats

Summary of reserves and resources by status – Cullinan
  Gross Net attributable
Category Tonnes
(millions)
Grade
(Cpht)
Combined diamonds
(Mcts)
Tonnes
(millions)
Grade
(Cpht)
Combined diamonds
(Mcts)
Ore/Diamond reserves
per asset
           
Proven            
Probable 13.866 37.10 5.144 10.261 37.10 3.807
Sub-total 13.866 37.10 5.144 10.261 37.10 3.807
Diamond resources
per asset
           
Measured            
Indicated 253.757 71.49 181.401 187.780 71.49 134.237
Inferred 167.105 10.04 16.777 123.657 10.04 12.415
Sub-total 420.862 47.09 198.178 311.437 47.09 146.652
Total     203.322     150.459
Resource bottom cut-off: 1 mm.
Reserve bottom cut-off: 1.2 mm.
Resource tonnes and grade are based on block cave depletion modelling, and include external waste.
Reserve carats and grades are factorised as per the following resource to reserve liberation factors: “Brown” kimberlite 75.8%, “Grey” kimberlite 71.4%, and Hypabbysal kimberlite 71.8%.
A total of 10 new drawpoints were added to the reserve.

Summary of reserves and resources by status – Koffiefontein
  Gross Net attributable
Category Tonnes
(millions)
Grade
(Cpht)
Combined diamonds
(Mcts)
Tonnes
(millions)
Grade
(Cpht)
Combined diamonds
(Mcts)
Ore/Diamond reserves
per asset
           
Proven 16.404 3.35 0.550 11.483 3.35 0.385
Probable 18.284 8.26 1.510 12.798 8.26 1.057
Sub-total 34.688 5.94 2.060 24.281 5.94 1.442
Diamond resources
per asset
           
Measured            
Indicated 4.196 6.01 0.252 2.937 6.01 0.177
Inferred 101.978 3.34 3.408 71.384 3.34 2.386
Sub-total 106.174 3.45 3.660 74.321 3.45 2.563
Total     5.720     4.005
Resource bottom cut-off (Koffiefontein underground and Ebenhaezer): 0.5 mm.
Resource bottom cut-off (Eskom tailings):1 mm.
Reserve bottom cut-off: 1.2 mm.
Changes due to geological re-evaluation and modelling of drilling results below 520 Level.

Summary of reserves and resources by status – Kimberley Underground
  Gross Net attributable
Category Tonnes
(millions)
Grade
(Cpht)
Combined diamonds
(Mcts)
Tonnes
(millions)
Grade
(Cpht)
Combined diamonds
(Mcts)
Ore/Diamond reserves
per asset
           
Proven            
Probable 3.219 19.58 0.630 2.382 19.58 0.466
Sub-total 3.219 19.58 0.630 2.382 19.58 0.466
Diamond resources
per asset
           
Measured            
Indicated 6.750 18.29 1.234 4.995 18.29 0.913
Inferred 55.798 10.03 5.595 41.291 10.03 4.140
Sub-total 62.548 10.92 6.829 46.286 10.92 5.053
Total     7.459     5.519
Resource bottom cut-off (Dutoitspan West Extension): 1 mm.
Resource bottom cut-off (all other underground blocks): 0.5 mm.
Reserve bottom cut-off: 1.2 mm.
Changes due to a complete geological re-evaluation of remaining resources and reserves in Wesselton 995 m Centre block cave, and Dutoitspan 870 m East and West block cave, plus re-evaluation of exploration development, drilling and sampling results for Dutoitspan NW corner.

Summary of reserves and resources by status – Kimberley Underground
  Gross Net attributable
Category Tonnes
(millions)
Grade
(Cpht)
Combined diamonds
(Mcts)
Tonnes
(millions)
Grade
(Cpht)
Combined diamonds
(Mcts)
Ore/Diamond reserves
per asset
           
Proven            
Probable 3.219 19.58 0.630 2.382 19.58 0.466
Sub-total 3.219 19.58 0.630 2.382 19.58 0.466
Diamond resources
per asset
           
Measured            
Indicated 6.750 18.29 1.234 4.995 18.29 0.913
Inferred 55.798 10.03 5.595 41.291 10.03 4.140
Sub-total 62.548 10.92 6.829 46.286 10.92 5.053
Total     7.459     5.519
Resource bottom cut-off (Dutoitspan West Extension): 1 mm.
Resource bottom cut-off (all other underground blocks): 0.5 mm.
Reserve bottom cut-off: 1.2 mm.
Changes due to a complete geological re-evaluation of remaining resources and reserves in Wesselton 995 m Centre block cave, and Dutoitspan 870 m East and West block cave, plus re-evaluation of exploration development, drilling and sampling results for Dutoitspan NW corner.

Summary of reserves and resources by status – Williamson
  Gross Net attributable
Category Tonnes
(millions)
Grade
(Cpht)
Combined diamonds
(Mcts)
Tonnes
(millions)
Grade
(Cpht)
Combined diamonds
(Mcts)
Diamond resources
per asset
           
Measured            
Indicated 90.006 5.01 4.512 67.505 5.01 3.384
Inferred 900.048 3.94 35.444 675.036 3.94 26.583
Sub-total 990.054 4.04 39.956 742.541 4.04 29.967
Total     39.956     29.967
Resource bottom cut-off: 1 mm.
Resource depletion calculated from in-pit survey.
Stockpile of 594,000 tonnes of RVK and BVK accumulated since plant shutdown at end of March 2010.

Summary of reserves and resources by status – Fissure mines combined (Helam, Sedibeng, Star)
  Gross Net attributable
Category Tonnes
(millions)
Grade
(Cpht)
Combined diamonds
(Mcts)
Tonnes
(millions)
Grade
(Cpht)
Combined diamonds
(Mcts)
Ore/Diamond reserves
per asset
           
Proven 1.494 48.57 0.726 1.354 51.01 0.690
Probable 2.073 61.30 1.270 1.976 63.07 1.246
Sub-total 3.567 55.96 1.996 3.330 58.17 1.936
Diamond resources
per asset
           
Measured            
Indicated            
Inferred 1.622 164.66 2.672 1.555 168.77 2.624
Sub-total 1.622 164.66 2.672 1.555 168.77 2.624
Total     4.667     4.560
Resource and reserve bottom cut-off: 1 mm.
Resource bottom cut-off: 1 mm.
Reserve bottom cut-off: 1 mm.
Measured resources are classified as 1 level below current workings, or where a block is bounded above and below by current workings.
Indicated resources are classified as 2 levels below measured resources.
Inferred resources are classified as 3 levels below indicated resources.
Measured and indicated resources have been converted to reserves by applying historically derived external dilution and in-stope loss factors to resource tonnages and grades.

Notes

The annual reserve and resource statements for Petra shown above are based on information compiled internally within the Group under the guidance and supervision of Jim Davidson, Pr. Sci. Nat. (reg. No.400031/06). Jim Davidson is the qualified person for the purposes of the AIM guidance note on Mining, Oil and Gas companies (2006). Jim Davidson has over 30 years’ relevant experience in the diamond industry and is a full-time employee of Petra.

All reserves and resources have been independently verified by Patrick Bartlett, Pr.Sci. Nat. (reg. No. 400060/87), a competent person with over 30 years’ relevant experience in the diamond mining industry. Reserves and resources have been reported in accordance with the South African code for the reporting of mineral reserves and mineral resources (SAMREC 2007).

Jim Davidson
Technical Director
24 November 2010